Reform 101 — Substrate repair and levelling system for damaged or uneven surfaces.

Rynova × Pava · repair

Reform 101

Substrate repair and levelling system for damaged or uneven surfaces.

What it is

Reform 101 is the underlying repair and levelling system in the Pava range. It goes down before any decorative finish on substrates that need bringing back to plane.

Specified when existing screeds are uneven, when small cracks need bridging, or when floor levels need correcting before applying Mini-S, Idropol, or another finish on top.

Where it's used

Designed for these surfaces.

Floors

Walls

Key properties

What makes it work.

  • Repairs uneven screeds and damaged substrates
  • Bridges small surface cracks
  • Compatible with all Pava decorative finishes on top
  • Cures hard enough to support continued application without delay
  • Reduces the need for full screed replacement
  • ISO 9001
  • ISO 14001
  • CE Marked
  • EPA Low Emissions
  • LEED Compliant
  • Fire Class Bfl-S1

Frequently asked

About Reform 101

Is Reform 101 a finish itself?

No. It is a repair and levelling layer that goes underneath a finish. You will not see it; the topcoat (Mini-S, Idropol, Art Stuc) is what is visible.

When do you specify it?

When the existing substrate is uneven, has minor cracks, or needs levelling. Our team assesses during the site visit and includes Reform 101 in the quote if needed.

Does it slow down a project?

It adds 1 to 2 working days for cure but saves the much larger cost of redoing a screed.

Will cracks reappear?

Reform 101 bridges small surface cracks, not structural movement. If the substrate keeps moving (settlement, structural issues), no overlay can hold, so the underlying issue must be addressed first.

Can I get it without microcement?

We do not supply Reform 101 standalone. It is specified as part of a Pava installation, not sold retail.

Rynova technical consultation

Ready to specify Pava?

We assess the substrate on site, match any RAL or Pantone colour, and return a sample within 48 hours.

Get a Quote